Place Based Planning
A key element of Catchment Systems Thinking is to have a spatially based plan that aligns the requirements and activities of key stakeholders and provides a guiding framework of the delivery required. This helps to drive effective partnerships and ensure that the activity delivered achieves the overall needs of a range of stakeholders, increasing efficiency and optimising the value delivered.
Factors used in this prioritisation included:
- Likely scale of AMP8 WINEP
- Risk of internal flooding per km of sewer
- Overflow spill volume per km of river
- Percentage household growth by 2050
- Percentage increase in properties at risk on a 1 in 50 year storm by 2050
- Percentage of outfalls locked on a 1 in 5 year storm
- Risk of standpipes in a drought
- Risk of measures being required to protect raw water quality
- Importance to long term Environmental Destination for WRMP
- United Utilities land holding
- Engaged partners
Key reasons for piloting in the Upper Mersey and Eden catchments was the potential to influence a significant amount of AMP8 WINEP expenditure projected for those catchments, along with the rich history of partnership working and established strategic partnerships.
Key reasons for piloting in the Wyre was that it is the top priority catchment for Environmental Destination focus alongside the potential for significant bathing water expenditure. There is an opportunity to align these priorities with the needs of other stakeholders.
Place Based Planning aims to provide a holistic and integrated approach to planning for sustainable water services, which puts communities and the places where people live and work at the centre of the approach. It ensures we consider and involve communities in the solution and supports preventative, cost effective responses by building resilient communities and targeting investment based on what works locally. It seeks to enable new development whilst ensuring it is done in a sustainable way, with a particular focus on making space for water at the outset.
The drivers of Place Based Planning are set out below:
Upper Mersey
Reasons for piloting in the Upper Mersey
- The potential to influence a very significant amount of our WINEP expenditure
- Significant development plans such as Timperley wedge, Carrington, Stockport MDC
- Highest risk of standpipes in a drought
- Second highest risk of internal flooding per km of sewer
- Highest risk of climate change leading to tighter WwTW permit limits due to lack of dilution
- Second biggest landholding (Goyt valley, Longdendale, Dovestone, Macclesfield forest) and drinking water catchment resilience highlighted as an issue
- Third highest CSO spill volume per km of river
- EA are reviewing their approach to flood defences for the Mersey and we need to address overflows which are close to or embedded in the flood defences.
- History of partnership working driving innovation with Natural Course, IGNITION, Moors for the future, Ship Canal partnership)
- Recently established strategic partnership with GMCA/EA focused on resilience and enhancing natural capital
Potential Partners
- GMCA
- Environment Agency
- Stockport Council
- Manchester City Council
- Mersey Rivers Trust
- Moors for the Future
- RSPB
- Forestry Commission
- The Rivers Trust
- Wildlife Trust
- National Trust
Eden
Reasons for piloting in the Eden
- Potential scale of AMP8 WINEP based on current expectation (second largest catchment)
- Driven by habitats directive drivers (investigated during AMP7)
- Green Recovery is targeting significant delivery in AMP7 reducing catchment phosphate
- Highest % population growth expected by 2050 (Carlisle Garden Village)
- Second highest risk of outfall locking in a 1 in 5 year storm
- Second highest risk of standpipes in a drought
- Significant flood challenges and potential alignment with other stakeholders
- Significant wastewater investment need and significant water abstraction (Cumwinton, Castle Carrock, Bowscar and Haweswater)
- Builds on the work done in the Petteril and the partnerships established
- Like minded landowners
- Aligned corporate interest (Nestlé etc.)
- Established partnerships (Petteril, RSPB Haweswater)
Potential Partners
- Eden Rivers Trust
- RSPB
- Lowther Estate
- North Pennine AONB
- Cumbria Peat Partnership
- Cumbria Wildlife Trust
- Nestlé
- Countryside Stewardship
- National Trust
- Cumbria County Council
- Environment Agency
Wyre
Reasons for piloting in the Wyre
- Top priority catchment for Environmental Destination
- Highest number of outfalls locked on 1 in 5 year storm
- Second highest % increase in properties at risk in a 1 in 50 storm between 2020 and 2050
- Significant flood challenges and potential alignment with other stakeholders
- Potential for significant bathing water expenditure
- Designated a drinking water protected area (pesticides, colour tbc)
- Green Recovery expenditure in AMP7 to improve raw water quality for Franklaw WTW
- Groundwater sustainability investigation in AMP7 may lead to abstraction licence reductions
- Builds on the Wyre NFM pilot project (Rivers Trust, Wyre Rivers Trust, EA, UU, Jriodos Bank, Co-op Insurance, FloodRe)
- Established bathing water partnership – Turning Tides (Blackpool Council, Wyre Council, Seton Council, Keep, Environment Agency)
Potential Partners
- Natural Course
- Wyre Rivers Trust
- Forest of Bowland AONB
- Catchment sensitive farming
- Wyre and Blackpool Councils
- Keep Britain Tidy
- Environment Agency
Updates
Have your say on our Draft WRMP
Our Draft Water Resources Management Plan (dWRMP) defines our strategy to achieve a...
Drought Plan 2022 Consultation Response
An update on our response to the Drought Plan 2022 consultation period, with links to our revised draft plan and amended HRA, SEA and technical appendices.
Continue the discussion
Over the next few months we will be engaging with stakeholders across the North West. Go to our Discussion Forum to share your thoughts and ideas